Packaging Details Packing:Four step packing to make sure safe transport. (1)Iron frame to fix equipment; (2)All structures fixed on the frame by screws; (3)All electric wires and motor are put into iron box; (4)Iron frame and box will be covered by stretch film. Port:Shanghai or Ningbo port Lead Time :Within 30 days after payment